By Jay Fox
Passive House Accelerator published a story about the Ice Box Challenge Montreal a few weeks ago. As we noted then, a conventional Ice Box Challenge involves two small buildings. The dimensions of the two are buildings are identical; the major difference is that one is built to the local code, and one is built to Passive House standards. Placed inside each one is a large block of ice. There are no active cooling systems, so the building enclosure does all the work to keep the ice from melting. The two buildings are then placed in a public square during a warm month for several weeks, after which the two blocks of ice are weighed. The winner is the building with the most ice left unmelted.